1. Home
  2. Blog
  3. Warranty, Service and Spare Parts: What to Check in a Warehouse Equipment Contract

Warranty, Service and Spare Parts: What to Check in a Warehouse Equipment Contract

Warranty, Service and Spare Parts: What to Check in a Warehouse Equipment Contract

Before signing a contract for the supply of warehouse equipment, check five groups of terms: the warranty period, scheduled maintenance, service response times, spare parts supply and the payment terms for work.

These clauses determine how much the business will spend on the equipment after purchase and how long the machines will stand idle in the event of a fault. That is why two offers at a similar price should be compared on the full cost of operation over the planned service life of the equipment.

Warranty terms

A warranty must state a specific start point, a duration and a list of the cases it covers. For warehouse equipment, check:

  • the start date: delivery, installation or commissioning;
  • the period in months and any limit in operating hours;
  • the list of components and work covered by the warranty;
  • the procedure for submitting a claim and documenting a fault;
  • the conditions for carrying out scheduled maintenance.

An example shows why the warranty terms need to be studied carefully. If the warranty runs for six months or 600 operating hours, whichever comes first, a machine working 80 hours a month will reach 480 operating hours in half a year. At 120 hours a month, the 600-hour limit will be used up in just 5 months.

Equipment from this articleMaterial Handling EquipmentView category

How to set out maintenance and service times

Scheduled maintenance is tied to the calendar, to actual operating hours or to both. The contract should separately specify the scope of work, the consumables and which party keeps the record of operating hours.

For more on organising servicing, see the article on warehouse equipment maintenance.

For service, distinguish three time limits:

  • response to a request;
  • diagnostics;
  • return of the machine to operation.

Each of them affects operating costs in a different way. If a forklift performs 18 pallet movements per hour, an eight-hour breakdown results in 144 movements not carried out. Then add overtime for staff, rental of a replacement or the transfer of operations to other warehouse equipment to the calculation.

The contract should also state how downtime is measured: from the moment a request is registered to the moment the machine is back in operation. This gives a single basis for checking actual service times and calculating the costs of each incident.

What to specify about spare parts

The spare parts section of the contract should set out delivery times and procedures. For critical parts, check availability in a local warehouse, the delivery time for items ordered on request, price approval and the warranty on the fitted component. Also specify payment for service call-outs, diagnostics and parts delivery.

Be sure to define the procedure for traction batteries: compatibility, diagnostics, replacement and charging equipment. The choice of technology also affects the service model.

The difference is clearly shown in the article on lead-acid and lithium-ion batteries.

How to compare two offers in money terms

Compare the total cost of ownership: purchase + scheduled maintenance + consumables + repairs + spare parts + cost of downtime.

For example, offer A is 50,000 UAH cheaper, but over two years it involves two additional breakdowns of 16 hours each, and one hour of downtime costs the business 2,000 UAH. The additional costs are 32 × 2,000 = 64,000 UAH: the initial price advantage is outweighed by operating costs.

Scheduled maintenance can be carried out by your own technical team or outsourced to a service contractor. TOP Logistics Solutions provides warranty and post-warranty servicing of warehouse equipment. In a contract with a service company, specify the maintenance intervals, response and diagnostic times, the procedure for ordering spare parts and the list of work that is paid for separately.

Equipment from this article
What suits your warehouse
Article author

A team of warehouse engineers and designers. We design, equip and launch warehouses anywhere in Ukraine: racking systems, automation, material handling equipment.

About the author
Consultation

Show us your warehouse.
We’ll take a look, then show you how to improve it

Leave your contact details and briefly describe the task. A TOP Logistics Solutions specialist will contact you, clarify the details and propose the next step.

Get a consultation

We’ll answer your questions and prepare an estimate.

By submitting this form, you agree to the processing of your personal data.

Call Calculate cost